This was a very difficult project for us due to the installation of a new gas service from the street. These projects require a lot of back and forth between the utility company, the building department, and the contractor. Many requirements must be met before the gas line is provided which means much of the project is done in stages. Our video system was put in place in the middle of this project which took the better part of a year to complete.
Video 1 from March 31st shows the old boiler being removed. Each section was vacuumed and cleaned before it was taken apart to ensure that the dirt did not go all over the boiler room. All the equipment was covered in plastic to protect it.
Each video is 30 -80 seconds long showing the day's work. Watch a heating system installation in only a few minutes!